AQUALOGUS - Suki Kinari Hydroelectric Plant
- FARAS web developer

- Feb 6, 2020
- 1 min read
Suki kinari Hydro engaged AQUALOGUS to carry out studies related to the Suki Kinari Hydroelectric Plant, located in the Himalayas, Pakistan, which is financed by the World Bank. It is one of the largest HPP in that country, with an installed capacity of 894 MW, and includes major underground works. AQL does the close monitoring of the excavation of underground tunnels, including the headrace tunnel with a length of 22,6 km, providing the technical and economic analysis of the real conditions of the excavated rock mass. The contract started in 2017 and is expected to last 4 years.


Comments